Commercial Work Offered

Commercial remodeling is the same trade work as a house, done in a space that has to open for business on a date. Small and mid size spaces are the fit: a suite in a strip center, a dental or medical office, a restaurant taking over a former one, a warehouse office that needs to look like the company it belongs to.

  • Tenant build-outs from a shell: framing, drywall, ceilings, doors, flooring, paint.
  • Office reconfigurations: walls moved, conference rooms added, break rooms built.
  • Retail refreshes: new floors, paint, fixture walls, slat wall and display built-ins.
  • Restaurant work: front of house finishes, tile, bar and host stand builds, restroom upgrades, FRP and tile in the kitchen.
  • Medical and dental suites: exam rooms, sterilization areas, lead lined walls for x-ray.
  • Restroom remodels to current accessibility layouts.
  • Drywall, ceiling grid and paint after a tenant moves out.
  • Reception desks, built in millwork and storefront finishes.

Commercial work sits beside the residential services on the remodeling page for homes and businesses.

Plans, Permits and Inspections

Commercial work in Fort Worth, Haltom City and the surrounding cities goes through a plan check before a permit is issued. The city looks at exits, fire separation, accessibility and occupancy load along with the construction itself, and most cities require stamped drawings from an architect for anything beyond paint and finishes. Every city on the list works from the same base code, which the state adopts and lets cities amend, as the Texas State Law Library explains. Landlord approval of the plans is part of the paperwork on a tenant improvement. The Texas Accessibility Standards apply to commercial construction above a cost threshold set by TDLR. A registered accessibility specialist inspects the finished space.

Commercial Finishes

Commercial finishes take more abuse than residential ones, so the specification changes. Level five smooth drywall in a lobby where the lighting shows every flaw. Commercial grade LVT, carpet tile or polished concrete on the floor. Solid core doors with lever hardware. Scrubbable paint in corridors and restrooms. Tile to the ceiling in a restaurant restroom. FRP panels in a kitchen. Acoustic ceiling grid in open offices, exposed and painted deck in a modern one. The materials match how the space will be used.

Working in an Open Business

A business loses money every day it is closed, so many commercial remodels are phased. A restaurant refresh happens in sections or after close. An office reconfiguration moves one department at a time. Retail floors go in over a weekend with the fixtures moved and reset. Dust containment and noise are the two constraints, and some cities and landlords limit construction hours in mixed use buildings.

Small Jobs Count Too

Not every commercial call is a build-out. Repainting a suite between tenants, patching drywall where the old shelving came down, replacing the flooring in a waiting room, or building a reception desk are all jobs on the list. Prep on commercial walls is covered on the painting page, and prep on a commercial slab on the flooring page. Larger interior scope is the same work as interior remodeling in a house, under a different code.

Job Photos

Drywall, insulation and finish work in commercial and residential spaces.

Hallway built in primed and ready for finish
Hallway built in primed and ready for finish
Insulation batts staged before install
Insulation batts staged before install
Drywall hung around the brick chimney
Drywall hung around the brick chimney

Common Questions

Can the work be done while the business stays open?
Often, yes. Phased work is common in commercial remodeling: a restaurant in sections or after close, an office one department at a time, retail floors over a weekend. Dust containment and noise are the limits, and the landlord or the city may set construction hours.
Does a tenant improvement need a permit?
Yes, in Fort Worth and every city around it, for anything beyond paint and floor coverings. The city checks exits, fire separation, accessibility and occupancy load during plan check, and landlord sign-off on the drawings usually comes first.
What is a tenant improvement allowance?
Money the landlord contributes toward building out a leased space, stated in the lease as a figure per square foot or a lump sum. It usually covers the shell build-out and not the tenant's furniture, equipment or branding, and the lease spells out what counts.
Do you build restaurant kitchens?
The shell, walls, floors, FRP, ceilings, restrooms and front of house, yes. Hood, fire suppression, grease trap and health department items are specialty trade work that goes on the same permit.
Is commercial remodeling labor taxed differently in Texas?
Yes. The Texas Comptroller treats labor on remodeling an existing commercial building differently from labor on a house. New construction has its own rules again. On a commercial scope the taxable and non taxable items are listed as separate lines. An accountant confirms how it applies to a given building.
What counts as commercial remodeling?
Any work on a building that is not a single family home: tenant build-outs, office reconfigurations, retail and restaurant refreshes, restroom upgrades, and repairs between tenants. The trades are the same as a house. The permit process, the finish spec and the schedule are what change.
In what order is a commercial build-out done?
Demo, then framing, then plumbing, electrical and mechanical rough-in with the city inspecting each before anything is covered. Then ceilings and drywall, then floors, paint and fixtures, then the final inspection that lets the space open. Fixtures and flooring are ordered at the start so they arrive before the drywall is finished.
How long does a commercial remodel take?
Plan check at the city is the long pole, and it starts before any demolition. After that the build moves at the pace of the inspections and the lead times on doors, fixtures and flooring. A refresh with no plumbing or wall changes skips most of that and runs in phases around the business.