Five Star Renovation DFW logoFive StarRenovation DFW

What a Kitchen Remodel Covers

A kitchen remodel is a full gut, down to the studs and the slab, or a surface job that keeps the layout and replaces cabinets, counters and fixtures. Both are common in Fort Worth, where houses built between 1970 and 1999 tend to have original cabinets, laminate counters and a kitchen closed off from the room where the family sits.

  • Base, wall, pantry and oven cabinets in stock, semi custom or custom lines.
  • Counters in quartz, granite, marble, butcher block, porcelain slab or laminate.
  • Tile backsplash, from one row above the counter to full height behind the range.
  • Islands and peninsulas with seating, storage, a prep sink or a cooktop.
  • Recessed cans, pendants and under cabinet lighting.
  • Undermount, farmhouse and workstation sinks, pull down faucets and pot fillers.
  • Walk in pantries, pantry cabinets and pull out storage.
  • Flooring run under the cabinets, drywall patched where the old uppers hung, paint.

Islands are laid out to the NKBA kitchen planning guidelines: 42 inches of walkway on a one cook side, 48 where two people pass. Kitchens are one of ten services under remodeling in DFW.

Cabinets: Stock, Semi Custom, Custom, Painted or Refaced

Cabinets are the largest single line on most kitchen jobs. Stock cabinets come in fixed sizes and ship fast. Semi custom lines add sizes, colors and inserts, with a longer lead time. Custom boxes are built to the room. Door styles are shaker, slab and raised panel, painted or stained.

Solid oak boxes from the 1990s are usually sound. When the layout works and only the color is wrong, a sprayed paint finish or refacing with new doors and drawer fronts changes the look for less material cost. When the layout is wrong, or the particle board has swelled under the sink, new boxes are used.

Counters and Backsplash

Quartz is the usual choice for a working kitchen. It needs no sealing. Cambria's care page lists warm water and a cloth. Granite is natural stone and wants a sealer every year or two. Marble etches under lemon juice and vinegar. Butcher block, porcelain slab and laminate are other options.

Stone is templated after the cabinets are set, then cut at the fabricator. Backsplash goes in after the counter: subway, marble look, zellige, hex, mosaic sheets or a slab of the counter material run up the wall. The joint where backsplash meets counter gets caulk, not grout, so it does not crack when the house moves on the clay.

Opening the Kitchen to the Living Room

The most requested change in a Fort Worth area kitchen is the wall between the kitchen and the living or dining room. In a 1970s or 1980s single story house that wall often carries the ceiling joists. The opening gets a header beam sized for the span and posts that land on the slab. Fort Worth, Haltom City and the cities around them require a building permit when a wall moves, and the plan check wants an engineer's letter or a stamped beam calculation for a load bearing opening. A wall that carries nothing is a smaller job: framing out, then drywall and texture patched on both sides.

Lighting and Electrical

Older kitchens usually have one ceiling fixture and a fluorescent box over the sink. A remodel replaces that with recessed cans, pendants over the island and under cabinet lighting.

Counter outlets, GFCI protection and the two small appliance circuits come from the National Electrical Code. The inspector counts them. A 1970s or 1980s panel rarely has the spare breakers, so new circuits are part of most kitchen jobs here. They are run by an electrician registered with the state electrician registry at TDLR and inspected by the city before the drywall closes.

The Slab Under the Cabinets

A kitchen slab in a 1980s Tarrant County house can have a half inch of drop across the room, because the clay under it moves. Cabinets set on that floor leave counters out of level and doors that will not line up, so the slab is ground or floated flat first. On a full remodel the new floor runs under the cabinets, not up to them. Flooring options are on the plank, tile and hardwood page, paint in the adjoining rooms under interior and cabinet painting, and a job that grows into the living room under interior remodeling and wall removal.

Job Photos

Kitchens around Fort Worth: cabinets, backsplash and progress shots.

Open kitchen with a stone island, black cabinets and black quartz counters
Open kitchen with a stone island, black cabinets and black quartz counters
Farmhouse sink, brass faucet and black cabinets on a plank floor
Farmhouse sink, brass faucet and black cabinets on a plank floor
Marble slab backsplash run to the ceiling behind a black range wall
Marble slab backsplash run to the ceiling behind a black range wall
Green base cabinets set with the counters going in
Green base cabinets set with the counters going in
Setting a tile backsplash above new green base cabinets
Setting a tile backsplash above new green base cabinets
White upper cabinets hung before the counters and backsplash
White upper cabinets hung before the counters and backsplash

Common Questions

Can the wall between my kitchen and living room come out?
Usually yes. The question is whether it carries ceiling joists or roof load. If it does, a header beam and posts replace it and the city wants an engineer's letter with the permit. If it carries nothing, it is a simpler opening with drywall and texture patched on both sides.
Can cabinets I bought myself be installed?
Yes. Cabinets from a big box store or an online line go in the same way as ones ordered through the job. The usual problems are boxes damaged in shipping and a layout drawn from a sketch instead of the room, so counting and opening the cartons on delivery day and checking the plan against real wall measurements matters.
How long is a kitchen without a sink during a remodel?
From the day the old counter comes out until the new counter is installed and plumbed. Stone is templated after the cabinets are set, cut at the fabricator, then installed, so that stretch is the longest gap without a working sink. A laminate or butcher block top closes the gap faster.
Can I keep my cabinets and change only the counters and backsplash?
Yes. Sound cabinet boxes with a new counter, backsplash, hardware and a sprayed paint finish is a common scope. It skips the cost and lead time of new boxes.
Does the new floor go under the cabinets?
On a full remodel, yes. Floor under the cabinets means the layout can change later without a bare patch, and the dishwasher can slide out without catching on a lip. On a counters-only job the existing floor stays.
In what order should a kitchen remodel be done?
The trade sequence is demo, wall or beam work, plumbing and electrical rough-in while the walls are open, drywall and texture, flooring, cabinets set on the finished floor, counters templated off the set cabinets, backsplash after the counter, then paint and hardware. That order means nothing gets installed twice.
What are the most common kitchen remodel mistakes?
Putting the sink or cooktop in the island, which turns the island into a work zone instead of a place to sit. Doors instead of drawers on the lower cabinets. Appliances ordered without checking the cabinet openings and the doorway they come through. Demo started while the cabinets are still weeks from delivery.
Do I need a permit to remodel my kitchen in Fort Worth?
If a wall moves, a water line, drain or gas line moves, or circuits are added, yes. Fort Worth also requires a permit when 16 square feet or more of drywall is replaced. Replacing cabinets, counters, backsplash and appliances in the same spots does not need one in Fort Worth, Haltom City or the surrounding cities. Most kitchens include an opened wall or new circuits, so most of them get a permit.
What is the downside to painting kitchen cabinets?
Oak grain still reads through paint, so a painted oak cabinet does not look like a factory finished one. Edges of the busiest doors wear first. Paint fixes the color, not the layout, so shallow drawers and a pantry in the wrong place stay where they are. Sound boxes with a layout you like are a candidate. Boxes you fight with every day are not.

Ready to open up the kitchen?

Call (682) 257-8161