Five Star Renovation DFW logoFive StarRenovation DFW

Remodeling in Southlake

Southlake grew from about 7,000 people in 1990 to over 31,000 by 2020, and the houses show it. Forty-five percent of the housing stock was built in the 1990s alone, with the rest split between the 1980s and the 2000s. These are large custom and semi-custom houses on big lots, most of them in the Carroll ISD schools, with high ceilings, formal dining rooms and kitchens that were the top of the line in 1996.

Subdivisions include Timarron, Shady Oaks, Monticello Estates, Coventry Manor, Versailles, Myers Meadow, Southridge Lakes, Chapel Downs and Cambridge Place, with Clariden Ranch on the Denton County side. Southlake Town Square sits where SH 114 meets FM 1709, and the subdivisions fan out from there. The Southlake Chamber of Commerce is the local business group.

Kitchen and Bath Rebuilds at the Same Footprint

A Southlake kitchen from the 1990s usually has stained cherry or glazed cabinets, a granite that has gone out of style, and a raised bar that blocks the view to the family room. The rebuild keeps the plan and replaces the finishes in it. The bar drops to counter height, cabinets go to the ceiling, appliances get panels, the hood is sized for the room, and the lighting is redone. Full kitchen rebuilds are the Southlake norm.

Bathrooms follow the same pattern. The tub stays when it is a soaking tub with a view. The shower gets rebuilt larger, with a steam unit when the ceiling is tight enough to hold it, and heated floors are a common add. Master bath rebuilds are on the bathroom page.

Additions, Outdoor Rooms and Teardowns

Southlake lots run an acre or more in the older subdivisions, which makes additions straightforward on the site side. Outdoor living rooms with a kitchen and fireplace, pool houses, in-law suites and full second stories are all additions on the permit side. On some lots the numbers favor a teardown and a new custom home instead, which the custom homes page covers.

Southlake Permits

The City of Southlake Building Inspections division issues a Residential Remodel permit for interior work. Flooring, cabinets and similar finish work are exempt. Window replacement, wall changes and trade work are not. Southlake also requires the general contractor to be registered with the city before a permit is filed.

Floors, Stairs and Paint on Large Houses

Flooring in a Southlake house is a large order. About four thousand square feet of 1990s tile and carpet comes out, the slab is flattened, and hardwood or wide plank goes back in. Stairs get new treads and risers, and iron balusters replace the oak spindles. Hardwood and plank flooring options are on the flooring page.

Paint on a house this size is its own trade. Two-story entries, coffered ceilings, crown in every room, and doors and trim that were stained in 1996 and are now going white. Trim and doors get sprayed, walls get brushed and rolled, and the work goes room by room so the house stays livable through it.

Exterior work is mostly the wood: cedar beams, garage doors, fascia and shutters that have weathered. Replacement, priming and paint, with the stone repointed where it has opened, are the usual list.

Other Tarrant County Cities

Recent Work

Kitchens, bathrooms and interiors across Dallas-Fort Worth.

Oak cabinet kitchen with a new white counter and stainless range
Oak cabinet kitchen with a new white counter and stainless range
Marble look shower walls with a built in niche and bench
Marble look shower walls with a built in niche and bench
Kitchen walls opened up with drywall patched around the old cabinet lines
Kitchen walls opened up with drywall patched around the old cabinet lines
Original oak cabinet kitchen with tile floor before the remodel
Original oak cabinet kitchen with tile floor before the remodel

Common Questions

Can the raised bar in a 1990s Southlake kitchen be lowered?
Yes. The raised section comes off, the half wall is rebuilt at counter height or removed entirely when it is not structural, and one continuous slab runs across. Outlets in that wall get relocated. It is the single most requested change in Timarron and Southridge Lakes kitchens because it opens the sight line to the family room.
Are outdoor kitchens and pool houses treated as additions in Southlake?
They are. A covered outdoor room needs footings, framing, a roof tied to the house or standing on its own, gas, electrical and drainage, and the city permits it as an addition. The structure and the appliances are remodeling work. The pool itself comes from a pool builder under its own permit.
When does a teardown make more sense than a remodel on a Southlake lot?
When the foundation, the roof and the layout all need work at once and the lot is worth more than the house on it. If the structure is sound and the plan is close, a rebuild of the kitchen, baths, floors and exterior gets the house to current finishes without giving up a mature lot and trees.
Does Southlake exempt flooring and cabinets from permits?
Yes. The city's Residential Remodel permit covers interior work that changes walls or involves the trades, and it lists flooring, cabinets and similar finish work as exempt. Window replacement is not exempt. A kitchen that keeps its walls but adds circuits or moves plumbing still needs the trade permits.

Remodeling in Southlake?

Call (682) 257-8161